First determine whether the parcel is inside the City of Midland or in unincorporated Midland County. Pull the appraisal record, current deed, recorded plat, easements, rights-of-way, mineral reservations, and releases. County platting guidance links 911 addressing to later driveway and onsite-septic applications, so verify the assigned address and the legal access shown on the plat. For acreage, read recorded pipeline, lease-road, well-pad, or surface-use documents rather than assuming the appraisal map describes every interest.
Separate wastewater, access, and drainage. Midland County directs septic permitting through the City and County Health Department, while Public Works addresses county permits and roads. Obtain the OSSF application, approved layout, inspection or operating evidence, maintenance papers for the system type, and repairs. Match the driveway or road-bore permit to current access. County materials state that floodplain permits are required for specified development outside city limits and coordinate administration with City Engineering. Playa lakes, ditches, fill, and grading can matter even where no structure has a documented flood history, so retain determinations, elevations, plans, photographs, and actual repair evidence.
Compare routes using verified obligations. Listing could involve septic service, a survey or title review, driveway work, drainage documentation, debris removal, repairs, showings, and continued taxes, insurance, utilities, and loan payments. In an as-is contract, review diligence, termination, deposit, proof of funds, title and mineral exceptions, closing charges, extensions, possession, and items remaining on acreage. Ask whether the buyer expects a floodplain, OSSF, plat, or access document resolved. Do not characterize oil activity or flood damage without parcel-specific records.
Compare selling options →