Confirm city limits before requesting records. The City of Odessa maintains its own construction and zoning files, while Ector County Development Services provides GIS, planning, addressing, and online permitting for county matters. Review the appraisal parcel, current deed, plat or survey, easements, mineral and surface reservations, pipeline or lease-road documents, and releases. Match county approvals to any manufactured-home placement, driveway, culvert, grading, floodplain development, or other work within county authority.
Verify utilities rather than guessing from acreage. For an onsite sewage facility, obtain the site evaluation, approved design, application, inspections, operating authorization, maintenance agreement if applicable, service reports, and repair permits from the responsible local program. Keep water-well or utility-provider records with the file. If a mapped flood area, playa, ditch, or drainage route affects the parcel, collect the current determination, elevation documentation, development permit, site plan, photos, claims, and invoices. Mapping or oil-field infrastructure does not by itself show damage or contamination.
Compare choices using the actual gaps. A listing may involve title research, OSSF service, access confirmation, permit follow-up, repairs, cleanup, showings, and continued taxes, insurance, utilities, and debt costs. In an as-is cash agreement, examine inspection and cancellation rights, deposit, proof of funds, title and mineral exceptions, closing charges, extensions, possession, and materials or equipment left behind. Ask whether the buyer expects any address, floodplain, wastewater, plat, or access item completed. Do not promise that county permitting resolves private covenants or surface-use rights.
Compare selling options →